Hole WAT11-131, which was drilled 60m west of hole WAT10-103 (15.5m grading 5.55% U308, intersected 16.5m (196m-212.5m) of variable radioactive mineralization at the unconformity, including several intercepts totaling 4.6m of ‘off-scale’ (cps >9,999) radioactivity.

Hole WAT11-127, drilled 10m north of hole 131, intersected 15.0m (195m-210m) of variable radioactive mineralization at the unconformity, including a 3.5m interval of ‘off-scale’ (cps >9,999) radioactivity.

Fission also stated that it allocated a third rig to drilling high priority targets on the Discovery Bay Corridor, where it recently completed a 31.7km time domain EM survey.

The first hole completed, WAT11-122, was drilled 338m west of the J Zone in sandstone immediately above the unconformity.

Fission have also completed holes WAT11-126, 230m west of 122, and WAT11-130, 340 m west of 122.