0.25m3/sec December to March, 0.5m3/sec April, May, October and November, 2m3/sec June to September
Capacity Factor
48%
Average Annual Energy
105GWh
Intakes
Existing intakes in Aberfeldie Dam, one originally in service, one blanked off, modified to produce two identical intakes of 19.25m3/sec capacity.
Waterway
Low Pressure Conduit (LPC) ~850 m buried 3.35m (132”) dia. Weholite HDPE plus ~150m surface-mounted 2.9m (114”) dia. steel pipes; Steel surge tank 15m high 13m dia. at junction of the LPC and HPP; 150m long 2.74m (108”) dia. steel High Pressure Penstock (HPP) down cliff face immediately behind powerhouse.
Turbines
3 x 8.33MW horizontal axis Francis
Generators
13.8kV direct-coupled synchronous
Powerhouse
Concrete substructure, steel superstructure
Switchyard
At powerhouse, step-up 13.8 to 69kV
Transmission Line:
None – direct connection to grid at switchyard
Design Earthquake:
BC Building Code – 1:2,500 event
Sign up for our weekly news round-up!
Give your business an edge with our leading industry insights.
I consent to Verdict Media Limited collecting my details provided via this form in accordance with Privacy Policy
Vist our Privacy Policy for more information about our services, how we may use, process and share your personal data, including information of
your rights in respect of your personal data and how you can unsubscribe from future marketing communications. Our services are intended for corporate subscribers and you warrant that the email address submitted is your corporate email address.