Table 1
Table 1: The Krahnjkar hydro scheme in figures Installed capacity 690MW Generating capacity Approx. 4,600GWh/year Turbines Francis, vertical axis -
We use them to give you the best experience. If you continue using our website, we'll assume that you are happy to receive all cookies on this website.
ContinueLearn More X
31 Dec 99
Table 1: The Krahnjkar hydro scheme in figures Installed capacity 690MW Generating capacity Approx. 4,600GWh/year Turbines Francis, vertical axis -
31 Dec 99
Summary of Lahmeyer International’s tunnelling work Goldisthal, Germany Baglihar, India (located on the Chenab river in Jammu & Kashmir) Mohale
31 Dec 99
Table 1 – Details of the ten storms used in the study Location Year Rain (mm) Dewpoint (oC) Max dewpoint
31 Dec 99
Table 2: Akosombo Dam – technical data Power house On the west bank, adjacent to the main dam is sited
31 Dec 99
ESC wicket gates User Name of power station Material Weight per part(t) Unit Number Total quantity Overall Weight (t) Harbin
31 Dec 99
How impact assessment has developed Feature 1970s 2000s Advantages Disciplines involved Bio-physical only Social added Integrated approach sought Study area
31 Dec 99
Table 2: European Bank for Reconstruction and Development: eligibility criteria for small hydro power projects Field Eligibility criteria Descriptor Evidence
31 Dec 99
New York dams in the Catskill and Delaware systems... Dam/Reservoir Maximum Total embankment Year Reservoir Normal Drainage dam height
31 Dec 99
Summary of hydro power project checklist Topic Item EIA Report complete? Approved? Other permits obtained? Explanation Project and impacts adequately
31 Dec 99
Table 1: Inflows greater than 20l/sec in the west side of access tunnel A Section length Initial/Max inflow Inflow after