Table 3

Table 3

31 Dec 99

Table 3. Reservoir Construction on Upper Yangtze and Its Tributaries In Different Time Periods Upstream of Yichang Time periods 1950s

News

Table 1

Table 1

31 Dec 99

Statkraft hydro schemes with 50MW generating capacity. Power plant County Stake in project Total generating capacity Average annual electricity output

News

Table 1

Table 1

31 Dec 99

Total installed generation capacity Source MWs % of Total Hydro 32,135 26.0% Thermal 81,939 66.3% (a) Coal 68,308 55.4% (b)

News

Table 1

Table 1

31 Dec 99

Table 1: Project reservoirs Feldsee Reservoir Wurtenalm Reservoir Capacity level 2217m above sea level 1695m above sea level Draw-down level

News

Table 1

Table 1

31 Dec 99

INEEL criteria VLH results Peripheral speed Acceptable: 6-12m/sec 4.5 up to 8m/sec Minimum pressure Acceptable: 69kPa 94kPa Maximum pressure variation

News

Table 6

Table 6

31 Dec 99

Table 6: Stability Analysis Summary for Upper Lake Aetna Dam Type Scenario FS Sliding Resultant Usual Normal Operation 26.3 Middle

News

Table 1

Table 1

31 Dec 99

Table 1: Summary of Project Details ITEM DESCRIPTION Project Owner / Client BC Hydro Water Source: Bull River Catchment Area