This pipeline will link the Goodwyn GH and Tidepole fields through a subsea tie-back to the existing Goodwyn A (GWA) platform.

Technip will be responsible for load out, transportation and installation of 16km of 16" gas flow line from the Tidepole manifold to the GWA platform.

The contract will be executed by the company’s operating centre in Perth, Australia, with support from the Singapore office.

France-based Technip is a provider of project management, engineering and construction services for the energy industry.