The deployment consists of a grove of Envision’s Solar Tree structures in a facility which will be open to the public.

The Solar Grove deployment includes Solar Tree structures which incorporate Envision’s CleanCharge CI (column-integrated) electric vehicle charging stations as well as energy storage elements.

The installation is scheduled for completion by the end of this year.

The Solar Tree structures also incorporate Envision’s EnvisionTrak multi-axis solar tracking technology which will increase the efficiency of the entire installation by as much as 25%.