As part of the deal, Enercon will provide its E92-2.3MW turbines to the Temiscouata 2 project in the Lower Lawrence region.

The construction cost of the project is expected to be around C$130m ($144m), reports windpowermonthly.com.

Boralex, which is developing the project along with Temiscouata regional municipal county, intends to produce power from the project by December 2014.

In addition, Enercon provided its turbines to the 25MW Temiscousta 1 project, which is currently under development.

In 2012, Enercon introduced E92 turbine while a prototype had been installed in 2013.