The Zachry/CB&I JV will engineer and design three LNG liquefaction trains and corresponding pretreatment facilities near the existing Freeport LNG regasification terminal.

The three LNG liquefaction trains will each have a rated capacity of 4.4 million tons per annum.

Within the three-train design, the JV will develop a fixed price/fixed schedule proposal for both a one-train initial development and a two-train initial development.

The design of the three-train project will allow for the expansion of additional liquefaction train(s) and pretreatment facilities.

The Freeport LNG regasification terminal is owned and operated by Freeport LNG Development.