The Jupiter Pipeline will be a 650-mile, 36-inch-diameter crude oil pipeline with origination points near Crane, Texas and Gardendale / Three Rivers, Texas, and an offtake point in Brownsville, Texas.

As designed, it will be the only pipeline out of the Permian Basin that will access all three deep water ports in Texas (Houston, Corpus Christi and Brownsville) and will have direct access to a fully capable VLCC loading facility off coast at Brownsville.

Jupiter Pipeline president Albert Johnson said: “Construction of the Jupiter Pipeline is a key element in achieving our vision of providing our customers with the best hydrocarbon solutions from the wellhead to the world.”

Source: Company Press Release