Aggreko is working with Gold Fields to install 21MW solar plant at Granny Smith gold mine in Western Australia.

younicos

Image: Younicos to install battery at Australian mine. Photo: Courtesy of YOUNICOS GMBH.

Aggreko won the contract to build and operate the 21MW power station in 2016, and has since worked with Gold Fields on plans to provide 7.3MW of solar power generation, as well as a 2MW/1MWh battery system, to be integrated with the existing gas supply as a hybrid power station.

Since acquiring battery storage company Younicos last year, Aggreko has been able to bring together multiple technologies and power sources to support off-grid applications at remote mine sites.

Younicos managing director Karim Wazni said: “We recently announced the availability of microgrids-as-a-service for customers who want to leverage the benefits of hybrid energy solutions while minimising capital outlay.

“This system will be the first time Aggreko incorporates battery storage into a hybrid power system, and – significantly – it’s a rental, which underscores the value and appeal of this new model.”

Aggreko AusPac managing director George Whyte said: “Our mining clients have faced a challenging market place and power generation is a significant proportion of operating costs. Our global capability offers additional flexibility which reduces investment and operational risk.

“Aggreko’s focus is on fuel efficiency and reliability in line with the power demand over the life of the mine.”

Gold Fields Australasia executive vice president, Stuart Mathews said that in addition to the cost efficiency and reliability benefits of the new hybrid power station, the upgrade reflected Gold Fields’ commitment to the increased usage of renewable and low-carbon energy sources throughout the Group. Gold Fields is committed to using renewables for at least 20% of total life-of-mine power requirements in new projects.

Mathews said: “The integration of renewables at Granny Smith mine is a demonstration of Gold Fields’ ongoing commitment to both environmental sustainability and innovation at its operations. These proposed new measures are intended to reduce our carbon footprint by utilising the latest hybrid energy technologies.”

Gold Fields currently operates all three of its Western Australian gold mines by using gas-powered electricity.

The proposed new hybrid power station, combined with a thermal station expansion at Granny Smith mine will meet the increased daily power needs of the entire mine of 24.2MW, with 8MW allocated to the Wallaby underground mine and the remaining 16.2MW for the processing plant, associated facilities and the mine camp.

Source: Company Press Release