Vector Resources has received initial assay results from the high priority drilling of the Phase 3 reverse circulation program which began in February last year at the company’s Gwendolyn East Project in Australia.

The drilling outside the resource area at Gwendolyn East included 5m at 22.68 grams per tonne (g/t) from 21m; 1m at 20.51 g/t from 36m; 2m at 12.44 g/t from 117m; 4m at 8.38 g/t from 111m and 10m at 7.12 g/t from 124m.

These results indicate the continuation of mineralization to the west and north-west of previously identified mineralized zones.

In addition, eight diamond holes will be drilled with the aim of obtaining suitable cores to conduct preliminary metallurgical and geological analysis for a future feasibility study.