The customer under the project was Serbian company Ro&Ro.

Turbine T-110 — is one of those turbines which were delivered by Ural Turbine Works to CHP Novi Sad in the late 70s. The reconstruction project included replacement of the hydraulic control system with electro-hydraulic system. This will enhance reliability, efficiency and precision of the control systems and insure ease use of the equipment.

"UTW implements its solutions for installation of modern control systems in all the projects related to modernization of turbines. It ensures compliance with the raised requirements on equipment operated by network. This time our project partner was Mihajlo Pupin Institute, which delivered the electronic part. For us it was new and very interesting experience of cooperation with a European institute," — said Igor Sorochan, Director General of UTW CJSC.