The Environment Agency’s hydro power potential

SOURCE: Creative Environmental Networks (CEN)

Site Net head Design flow rate Max power Annual energy
Allington Lock 3.8-4.5m 11m3/sec 233kW 510,270kWh
Hampstead Lock/Weir 2.8m 9m3/sec 141kW 620,000kWh
Leigh Barrier 3m 4m3/sec 67kW 290,000kWh
Sluice Weir 2.7m 7m3/sec 107kW 470,000kWh