The company teamed with CETCO Contracting Services and Nucero Electric to design, engineer and install the ground mounted solar system.

The array is located at the Southeast Water Pollution Control Plant and is expected to generate approximately 330,000kWh of solar electricity per year.

The solar system will displace approximately 220 metric tons of carbon dioxide each year.

Dynamic Solar designs, constructs and maintains solar power projects for commercial, industrial and institutional clients.