The Glaze 11-5 is expected to take about one month to drill and fully stimulate

oil-g21901975e_640

Maha Energy AB spuds Glaze 11-5 well onshore Illinois Basin, US. (Credit: Terry McGraw from Pixabay )

Maha Energy AB (publ) (“Maha” or the “Company”) is pleased to announce the spudding of the Glaze 11-5 oil production well onshore USA.

On March 1st Maha begun drilling the Glaze 11-5 well using Les Wilson Drilling’s Rig #22 in the Illinois Basin (“IB”). This 4,000’ vertical well is located in the heart of the Mississippi Lime play in IB targeting several stacked pay layers. The Glaze 11-5 is expected to take about one month to drill and fully stimulate. Stimulation fluid flow back is expected to take another two weeks before the well can be placed on production. Initial productivity of this well is expected between 50-70 BOPD when brought on production during the second quarter of 2022.

Maha Energy AB, through its subsidiaries owns and operates a legal and beneficial 75% Working Interest (WI) in the SES-107D Block (Tartaruga) onshore Sergipe State Brazil, a 99% WI in the LAK Ranch heavy oil field in Wyoming USA, a 100% Working Interest (WI) in the Tie Field onshore Bahia State Brazil, an initial 100% WI in the Block 70 Mafraq field under the Exploration and Production Sharing Agreement with the Government of Oman and approximately 96% WI in the acreage in the Illinois Basin.

Source: Company Press Release