About 298Bm3 of water flowed through the Three Gorges dam in 2006, down 33.9% from the average figure in previous years.

In 2006, the Three Gorges Project Corporation signed contracts with the State Power Grids to pre-sell nearly 300TWh of electricity to the State Power Grids for the 2006-2010 period.