Sandvik introduces new battery-electric loader LH518B
The LH518B from Sandvik has been designed, ground-up, entirely around the loader’s Artisan battery system and electric driveline
We use them to give you the best experience. If you continue using our website, we'll assume that you are happy to receive all cookies on this website.
ContinueLearn More X
30 Sep 20
The LH518B from Sandvik has been designed, ground-up, entirely around the loader’s Artisan battery system and electric driveline
29 Sep 20
The conveying system overcomes an altitude difference of 1,200m and covers a distance of almost 13km
25 Aug 20
The Plant has been on recent care and maintenance and includes: primary, secondary, and tertiary crushing, milling, two…
17 Aug 20
The PhotonAssay unit for Fosterville is expected to be fully operational by early October
04 Aug 20
Novum to recycle BHP’s used earthmoving tyres at its processing plant, which is under construction in Nebo, Isaac
24 Jun 20
The firm's autonomous haul fleet has moved around 1.4 billion tonnes of material
28 May 20
The contract worth $20m includes supply of underground loaders, face drill rigs, rock bolting rigs and mine trucks
26 May 20
The two solutions are designed to provide significant resource and time savings for the mines
12 Feb 20
The contract includes the building construction and equipment supply for the robotic sample preparation and analysis laboratory
Opportunities being created in mining in 2020 include cost reduction, improved production, enhanced safety performance, and the ability…