Table 1
Table 1: Improvement Timeline 2004 Replace two turbines, initiate Pacific Lamprey studies, replace all ten water intake gates and replace
We use them to give you the best experience. If you continue using our website, we'll assume that you are happy to receive all cookies on this website.
ContinueLearn More X
31 Dec 99
Table 1: Improvement Timeline 2004 Replace two turbines, initiate Pacific Lamprey studies, replace all ten water intake gates and replace
31 Dec 99
Hydropower plants in Mauritius Serial No Name Plant capacity (MW) Effective capacity (MW) Units generated in 2002 (kWh) CEB Plants
31 Dec 99
Table 2. Climate change scenarios DT = 1?C DT = 2?C DT = 4?C Annual precipitation +3% +6% +12% Summer
31 Dec 99
Table 5. Percent sodium at different locations R.D. Percent Sodium 39.50 81% 40.00 72% 42.50 55% 45.00 81% 47.50 81%
31 Dec 99
Table 1: DETAILS OF SHOCK/ AFTER SHOCKS OF MAGNITUDE 5.0 AND ABOVE ON RICHTER SCALE ( Maximum daily ) RECORDED
31 Dec 99
GENERATION DATA Generation Capacity 18,86MW Grid Connection Voltage 34,5kV Short Circuit Ratio 1,0 Number of Units* 3 WATER DATA Design
31 Dec 99
Table 1 Year Priest Rapids development Wanapum development Priest Rapids project 2003 0.9392 (0.0169) 0.9215 (0.0402) 0.8663 (0.0442) 2004 0.9399
31 Dec 99
Table1: The contracts awarded for civil works Contract Company B1 SRG (changed name to AF anlegg 1st April) B2 SRG
31 Dec 99
Table 2: Relative importance index and ranking of delay factors Owners Consultants Contractors Overall Category Factor Index Rank Index Rank