Table 1
Table 1 nq Vsp Vv Vr Vdt Vd 20 0.05 0.20 0.16 0.00 0.19 45 0.09 0.12 0.20 0.01 0.08
We use them to give you the best experience. If you continue using our website, we'll assume that you are happy to receive all cookies on this website.
ContinueLearn More X
31 Dec 99
Table 1 nq Vsp Vv Vr Vdt Vd 20 0.05 0.20 0.16 0.00 0.19 45 0.09 0.12 0.20 0.01 0.08
31 Dec 99
Table 2: Major projects under construction in Uttaranchal Serial No. Name of project Installed capacity (MW) 1 Tehri, Stage-I 1000
31 Dec 99
Parbati project stage II: technical features 85m high concrete gravity dam 130m high, 17m diameter orifice-type surge shaft 6m diameter,
31 Dec 99
Table 2. The results of total risk analyses of dams within the Euphrates basin Dam MCE PGA Hazard Class Hazard
31 Dec 99
Table 1: Annual sedimentation rate according to bathymetric surveys carried out in 1986 and 2004 Dam Sedimentation rate from 1986
31 Dec 99
Table 1: Permeation resistance index of RFC in different areas Specimen position RFC body Hot joint Cold joint Permeation resistance
31 Dec 99
Table 1: Inflows greater than 20l/sec in the west side of access tunnel A Section length Initial/Max inflow Inflow after
31 Dec 99
Table 3: Mechanical and Electrical Works in the Powerhouse – Lots 4 and 5 Feature Dimension/Quantity Unit Francis Turbines 4
31 Dec 99
Table 4: Samanalawewa Hydroelectric Project Main Characteristics Dam Type Rock Fill Earth Core Height 100m Length 530m Volume of fill
31 Dec 99
Sample times Time Load (MW) 2315 50 2317 110 2330 200 2331 165 2344 to 0015 600 0030 135 0030