Table 2
Table 2 Historic storm depth (mm) and estimated SMD (mm) Date of storm Maximum rainfall SMD 28/6/1917 243 47 15/8/1952
We use them to give you the best experience. If you continue using our website, we'll assume that you are happy to receive all cookies on this website.
ContinueLearn More X
31 Dec 99
Table 2 Historic storm depth (mm) and estimated SMD (mm) Date of storm Maximum rainfall SMD 28/6/1917 243 47 15/8/1952
31 Dec 99
Issuance success of CERs by Sector following submission of Project Design Document (PDD) Project Type % of issuance % of
31 Dec 99
Table 1: Table of Gezhouba Power Plant parameters: Items Unit #1~2 Unit #3~21 Items Unit #1~2 Unit #3~21 Unit model
31 Dec 99
Table 3: Length, pressure and method of high pressure grouting Hole depth (m) 0.0 ~ 2.0 2.0 ~ 6.5 (8.0)
31 Dec 99
Funding context Technology development stages Typical project budgets Stage 1: Proof of concept and pre-prototype scale testing at sea £500K
31 Dec 99
Table 1 – Project man-hour statistics Project Head (m) Capacity (MW) MW/h0.3 Man-hours 1. Maggoty (Jamaica) 88 6.1 1.6 10,850
31 Dec 99
Estimated Cost of Hydrokinetic Energy Production at Selected Alaskan Locations Location Estimated cost/kwh Igiugi (River) $0.68 Eagle (River) $0.68 Whitesotne
31 Dec 99
Underwater repair methods... Methods for placing concrete underwater and special mix designs allow virtually any type of concrete repair, or
31 Dec 99
Table 4, Qualitative comparison of the environmental performance of a linked-basins TPP at Fundys Shepody Bay (HB) and Cumberland Basin(LB),