Table 3

Table 3

31 Dec 99

Table 3: Detailed project report contents Section Main Report 1 Introduction 2 Economic Scene 3 Need for the Project 4

News

Table 2

Table 2

31 Dec 99

Table 2: Construction history July 1993 Kannagawa hydro power field survey office was established July 1995 The construction of the

News

Table 4

Table 4

31 Dec 99

Table 4: Reservoirs with residual storage capacity Prevailing use Number of dams Volume (hm3) Storage capacity used Residual storage capacity

News

Table 2

Table 2

31 Dec 99

Table 2: Example Listing of Countries with Dam Safety Legislation Argentina Federal regulations for privatized dams only Australia Dam safety

News

Table 6

Table 6

31 Dec 99

Table 6. Model results for a variety of conditions at Langtoft Date Rainfall mm:hr SMD Effective rain Peak discharge Rp

News

Table 1

Table 1

31 Dec 99

Table 1: Installed hydro capacity on Ethiopia’s ICS power grid Name of plant Generation (MW) Year of commission Koka 43.2

News

Table 2

Table 2

31 Dec 99

Table 2. Properties of ground motion records used in the analyses No Earthquake Date Station Component 1 Parkfield 28/6/66 1438

News

Table 4

Table 4

31 Dec 99

Table 4 Magnitude frequency relationships for SMD based on 11 years weighing lysimeter data at CHRS End of April SMD

News

Table 3

Table 3

31 Dec 99

Table 3 Removal costs of hydroelectric projects in the US Dam Height Installed Capacity Physical Removal Complete Removal Cost Removal

News