Table 5, Summary of the energy costs of double-basin schemes at Fundys Shepody Bay and Cumberland Basin. Costs as shown are based on the use of fish-friendly turbine generators and sluices, equpped with automatic flap gates.
Paired basins |
|
|
|
|
Number of turbine-generators |
Annual energy Shepody Bay GWh |
Cumberland Basin GWh |
Cost of Energy c/kWh |
Comments |
83 & 61 (144) |
Type Z 5191 |
Type Z 3771 |
3.82 |
At Fundy, with its specific environmental concerns, only paired-basins Types Z & Z would meet the adopted environmental sustainability standards. |
53 & 37 (90) |
Type Y 3767 |
Type X 3154 |
3.46 |
|
Linked basins |
|
|
|
|
Phase I 53 |
Type X 4461 |
|
3.83 |
The 7,200 m long dam required to create the enlarged Cumberland Basin raises the cost of energy for the linked-basins scheme to above that of paired-basins Types X & Y. With a shorter dam at Cumberland basin, the energy cost of the linked-basins could have been 2.9&icent;/kWh. |
Phase II 53 |
High-basin for linked basins |
Low basin 5625 |
3.59 |
|
|