Niagara river hydroelectric facilities
Facility |
In-service year |
Diversion capacity m3/sec |
Station capacity MW |
Annual energy TWh |
Annual capacity factor |
Sir Adam Beck No.1 |
1922 |
600 |
498 |
2.6 |
|
Sir Adam Beck No.2 |
1954 |
1,200 |
1,499 |
9.2 |
|
Sir Adam Beck PGS |
1958 |
– |
174 |
(0.1) |
|
Current Totals |
|
1,800 |
2,171 |
11.8 |
0.63 |
Niagara Tunnel |
n/a |
500 |
– |
1.6 |
|
Totals (Canada) |
|
2,300 |
2,171 |
13.4 |
0.72 |
Robert Moses |
1964 |
3,000 |
2,400 |
14.2 |
|
Lewiston PGS |
1964 |
– |
300 |
(0.5) |
|
Totals (USA) |
|
3,000 |
2,700 |
13.7 |
0.60 |
|