Following six years of detailed design and development on a seventh-scale model, Ocean Power Delivery Ltd has completed the construction of the first full-scale Pelamis wave energy converter.

wave_farm_artis_c9_x2205_582K

Similar in size and rating to a modern wind turbine this is the world’s first commercial-scale floating wave energy converter. The unit arrived at the port of Leith, Edinburgh, in February for dockside commissioning which is scheduled for completion by end-March. Folowing that it will be towed out to its working site, off Orkney, near Stromness. The illustration above is an artist’s impression of a full scale ‘wavefarm’.

The 750 kW machine measures 120 m long by 3.5 m wide and weighs 750 tonnes fully ballasted. It was assembled and fabricated in Scotland.


Related Articles
Wave power moves ahead
Testing times for tidal power
Wave energy in motion
Waving in energy
BC Hydro takes up ocean wave energy
UK creates waves at renewables test centre
UK minister gives go-ahead to marine energy projects
UK Minister outlines developments in tidal technology
First wave plant within two years