This additional work includes hi-resolution airborne magnetic, airborne VTEM and ground TDEM geophysical surveys. The results from this summer’s surveys will be used to prepare winter drilling targets.
At the Fond Du Lac project, exploration has been further extended based on mineralization recently discovered in basement structures. The Company had been testing known sandstone uranium mineralization, but is now concentrating on encouraging uranium mineralized intersections in structures located below the unconformity. Current drilling is focusing on the eastern end of the deposit, where major structures intersect the trend of the sandstone-hosted mineralization. This new basement-hosted mineralization extends the length of the known deposit by approximately 75 metres.