Salient features of Purulia pumped storage project
Salient features of Purulia pumped storage project Installed capacity 4 x 225MW Peak operation duration Six hours Maximum power discharge
We use them to give you the best experience. If you continue using our website, we'll assume that you are happy to receive all cookies on this website.
ContinueLearn More X
31 Dec 99
Salient features of Purulia pumped storage project Installed capacity 4 x 225MW Peak operation duration Six hours Maximum power discharge
31 Dec 99
Table 2: Akosombo Dam – technical data Power house On the west bank, adjacent to the main dam is sited
10 Nov 99
Oregon-based electric utility PacifiCorp has opted to remove the 38m high, 86-year-old Condit dam in the US. Rather than install
10 Nov 99
Following the investigation of the US Army Corps of Engineers into the dams affected during the Chi Chi earthquake in
08 Oct 99
The US Army Corps of Engineers (USACE) has postponed the issue date of the report on the Snake river dams
10 Sep 99
Norbert Beltz and Horst Weber* look at how hydro power plant operators can refine their water level forecasting…
10 Sep 99
Does dam removal really improve the overall health of a river? Emily H Stanley* reports on a research…
10 Sep 99
China now has 39 concrete faced rockfill dams in operation. Cao Keming* and Zhuang Wenzhong** discuss the design…
10 Sep 99
Puclaro dam is founded on very pervious riverbed alluviums more than 100m deep. The design therefore included a…
10 Aug 99
Formwork specialist, RMD Indonesia, helped the construction of Balambano dam in South Sulawesi get back on schedule. Andrew…